Jump to the content zone at the center

MSO service rates

Service Rates

MSO service rates
Taipei City Mortuary Services Office

Code Item Unit Q’ty Price Note
Regular Discounted Increased
1 Grade A Funeral Hall Rent
Hour
1
1,800
600
3,600
1. The price of funeral halls is 50% off for July on the lunar calendar and 18:00 to 06:00 on the next day.
2. Low-income families of Taipei City may use Grades C and D funeral halls for free with the low-income family certification.
2 Grade B Funeral Hall Rent
Hour
1
750
300
1,500
3 Grade C Funeral Hall Rent
Hour
1
600
225
1,200
4 Grade D Funeral Hall Rent
Hour
1
225
75
450
5 Grade A Funeral Hall Air-conditioning
Hour
1

1,200

 
6 Grade B Funeral Hall Air-conditioning
Hour
1
450
 
7 Grade C Funeral Hall Air-conditioning
Hour
1
300
 
8 Grade D Funeral Hall Rent Air-conditioning
Hour
1
150
 
9 Body Transportation
Time/body
1
1,000
NT$1000 for 10km within Taipei City. An additional NT$500 will be charged for every additional 5km. Distances less than 5km are considered as 5km.
10 Body Preservation
Time
1
500
Consumptive cost for formalin injection
11 Body Refrigeration
Day/body
1
400
See note
12 Body Deposit
Day/body
1
300
See note
13 Body Washing
Time/body
1
300
 
14 Body Makeup
Time/body
1
300
Including hair-dressing
15 Body Dressing
Time/body
1
300
 
16 Body Coffining
Time/body
1
300
 
17 Body fixing
Inch
5
1,50
Estimated by every 5 inches, and an additional NT$100 for every additional inch.
18 Hall Cleaning Up Fee
Time
1
Grade A Hall: NT$500
Grade B Hall: NT$300
Grade C Hall: NT$200
Grade D Hall: NT$100
Including the cleaning up of elegiac scrolls and garbage after the funeral.
19 Cremation Fee
Body
1
NT$2000 for Taipei citizens and NT$6000 for non-Taipei citizens.
Triple price for non-Taipei citizens
20 Urn Sealing Fee
Piece
1
300
Free for Taipei citizens
21 Fude Public Cemetery Fee
m2
6.6
73,200
Due to the space limit in Taipei City, only Taipei citizens can be buried in the Taipei City public cemeteries. Also, the family should collect the bones of the deceased after 7 years to save space.
22 Fude Public Cemetery Fee
m2
13.2
221,700
Due to the space limit in Taipei City, only Taipei citizens can be buried in the Taipei City public cemeteries. Also, the family should collect the bones of the deceased after 7 years to save space.
23 Pre-cast Public Cemetery Fee
1
77,000
Due to the space limit in Taipei City, only Taipei citizens can be buried in the Taipei City public cemeteries. Also, the family should collect the bones of the deceased after 7 years to save space.
24 Ash Urn Deposit Piece 1 NT$10,000 for Taipei citizens and
NT$30,000 for non-Taipei citizens.
Triple price for non-Taipei citizens
25 Bone Urn Deposit Piece 1 NT$30,000 for Taipei citizens and
NT$90,000 for non-Taipei citizens.
Triple price for non-Taipei citizens

Note:
1.Citizens with household registered in the following boroughs may subscribe for the above services for free when the procession is held within 15 days, except for the public cemetery fee and bone (ash) urn deposit which should be charged as net. When the procession is held after 15 days, citizens should pay all fees as shown in the table. These boroughs include Xingzheng, Xingxiao, Xingren, Songjiang, Jiangning, Xinsheng, Xinfu, Xinxi, Dajia and Xinzhuang boroughs of Zhongshan District; Qingfeng, Liyuan, Fanghan, Nongchang and Wolong boroughs of Daan District; Xingtai and Bojia boroughs of Wenshan District; and Linquan and Yonghe boroughs of Beitou District.
2.Body refrigeration and deposit rates:
2.150% off the listed price within 7 days;
2.2Regular price as shown in the table over 7 days but less than 14 days;
2.3When the length is over 15 days, in addition to the full rate for all MSO services chargeable daily for body refrigeration in the first 14 days, an additional NT$200 will be charged for every service item at each interval of 3 days since Day 15 to Day 32.
2.4When the length is over 32 days, in addition to the policy specified in Item 3, the additional charge will be calculated on a daily basis since Day 33.
3.These rates are reviewed every year after revision and implementation.